HOW TO COMPARE STEEL LEAD TIMES TO NOT GET BURNED

HOW TO COMPARE STEEL LEAD TIMES TO NOT GET BURNED

When reviewing a steel project, it can be tempting to focus primarily on tonnage. After all, more steel typically means a larger project and a higher price. But as most fabricators know, tonnage is only part of the story. In fact, two projects with similar tonnage can...

read more
5 SCOPE GAPS EVERY ESTIMATOR SHOULD CHECK

5 SCOPE GAPS EVERY ESTIMATOR SHOULD CHECK

Most estimating mistakes are not caused by major omissions. More often, they come from small scope gaps that seem insignificant during bidding but create questions, change orders, or unexpected costs later in the project. The challenge is that many steel projects move...

read more
STEEL PRICING: MORE THAN TONNAGE

STEEL PRICING: MORE THAN TONNAGE

When reviewing a steel project, it can be tempting to focus primarily on tonnage. After all, more steel typically means a larger project and a higher price. But as most fabricators know, tonnage is only part of the story. In fact, two projects with similar tonnage can...

read more
A QUICK RFQ CHECKLIST

A QUICK RFQ CHECKLIST

Most estimators have experienced it. You send out an RFQ, pricing starts coming in, and the questions begin. A drawing is missing. A detail is unclear. An addendum wasn't included. Scope assumptions start to vary from one bidder to the next. None of these issues are...

read more
HOW TO COMPARE STEEL BIDS

HOW TO COMPARE STEEL BIDS

When steel bids come in, it can be tempting to focus on one number: the lowest price. But in construction, the lowest bid is not always the lowest cost. Differences in scope, assumptions, schedule, and execution can create expensive surprises later. A bid that looks...

read more
5 Ways to Prevent Steel Change Orders

5 Ways to Prevent Steel Change Orders

Fabrication change orders create problems for everyone involved in a project. They disrupt budgets, create schedule pressure, and force teams to revisit decisions that were assumed to be settled. They also consume time that estimators, project managers, and...

read more
Loop in Your Steel Fabricator Early

Loop in Your Steel Fabricator Early

Most steel problems don’t start in the shop. They start before the fabricator is involved. By the time a fabricator is formally looped in, the design is often set, the schedule is locked, and the budget has very little flexibility left. At that point, feedback tends...

read more
Steel Pricing in 2026: What GCs Should Expect

Steel Pricing in 2026: What GCs Should Expect

The structural steel market is entering a period of heightened uncertainty, and GCs will feel the impacts first Over the past several weeks, steel fabricators across the country, including JT Steel, have received an increasing number of pricing increase letters from...

read more
Why Steel Shape Knowledge Matters

Why Steel Shape Knowledge Matters

You can't estimate what you don't understand. In structural steel, that means knowing your W-beams from your channels, your angles from your tubes — and being able to read them confidently from drawings and specs. If you’re not fluent in steel shapes, you’re taking a...

read more